Planning a Peula
Navigate Maslulim
Use the Maslul page to view trails by segment, tzevet, and target before opening a trail editor.
At a glance
- 1Open Maslul from the shevet dashboard. The page opens on the Maslulim tab.
- 2Use the segment bar to switch among the three date windows; each label shows its configured date range and number of trails.
- 3Review the cards in the selected segment to see the tzevet or multi-tzevet audience, target, dates, and recent update.
- 4Open a trail card when you are ready to work on its content; the page-level view is for choosing and organizing trails.
Step-by-step walkthrough
1.Read the segment board
The Maslulim tab groups trails by segment. The selected segment controls the list below it.

- Segment barCompare the date ranges and the number of trails. Now marks the current window.
- Trail cardCheck the tzevet and target before opening the trail to edit its goals.
- SettingsChange the shevet’s segment dates here if you have access, not on the list.
- 1Open Manage Peulot, then Maslul. Pick the segment covering the date you are planning for.
- 2Read the target and tzevet on each card to distinguish similarly named trails.
- 3Open the trail to work on its contents. Return to the segment board to switch trails.
If you cannot do this
- You only see trails for tzevatim and targets you are allowed to access.
- An empty segment means no active trails exist in that date window.
Where to look
Maslulim
the Maslul page